Lehi is mostly newer houses, which helps in one way and not at all in another. The panel is usually modern, the service is usually adequate and the gas is usually already at theā¦
Lehi is mostly newer houses, which helps in one way and not at all in another. The panel is usually modern, the service is usually adequate and the gas is usually already at the house, so the electrical side of a generator project tends to be straightforward. What is almost never there is any provision for the generator itself.
Builders do not generally leave a stub for a standby unit, a pad, or spare gas capacity beyond the appliances the house shipped with. So the work in Lehi is usually about adding a load to a system that was sized precisely for what it already has - which is a sizing question, not a wiring one.
A standby generator is a substantial gas appliance. Dropped onto a meter and a pipe run that were sized for a furnace, a water heater, a range and a dryer, it can take the total demand past what the existing service supports - and the symptom is not a dramatic failure. It is appliances underperforming when several run at once, which is exactly what happens during the cold snap when the generator is also running.
The correct step is a load calculation across everything the house has plus the proposed generator, measured against the meter and the pipe sizes actually installed. Sometimes the existing system takes it. Sometimes the meter needs to be upgraded with the utility, or a larger line run from the meter to the generator. None of that is unusual, but all of it is cheaper to find out at the quoting stage than after the pad is poured.
If your Lehi house is still being built, a generator provision is one of the cheapest things you will ever add and one of the most expensive to retrofit. A conduit from the panel location out to where a pad would sit, a gas stub at the same place, and a few inches of spare room in the panel for a transfer switch cost very little during construction.
You do not have to buy a generator to do this. The provision is worth having on its own; it converts a future project from a retrofit into an installation. The window closes when the exterior is finished and the driveway goes in, and reopening it means trenching through landscaping that did not exist when the decision was first available.
Most generator repair calls are not really repairs. They are a unit that has sat for several winters with no service, whose battery has quietly died or whose oil has not been changed since it was commissioned, discovered at the exact moment it was needed. The equipment is usually fine; the maintenance was not.
If yours failed during an outage, the useful information is when it was last serviced and whether the weekly self-test has been running. A unit that has been testing itself and still failed is a genuine fault. A unit nobody has touched in four years is a maintenance problem with a predictable ending.
Often yes, but it has to be calculated rather than assumed. A standby generator is a large gas load, and newer houses are typically sized for exactly the appliances they shipped with. The check covers total demand against the meter and the installed pipe sizes, and it is quick.
A conduit from the panel location to where a pad would go, a gas stub at the same point, and physical room in the panel for a transfer switch. All three are inexpensive during construction and awkward afterwards, and none of them commits you to buying a generator.
Usually not. The most common causes are a failed starting battery or long overdue service, neither of which is a failure of the generator itself. Worth knowing when it was last serviced and whether its self-test has been running, because that distinguishes neglect from a real fault.
For some households, yes - but it must never be run in a garage, a crawlspace or anywhere attached to the house, and an open door is not ventilation. It also has to be connected through a proper inlet and interlock rather than a cord into an outlet, which backfeeds the grid and is dangerous to line crews.
The permanent version: a unit set outside on a base, plumbed for fuel, wired through a transfer switch, permitted and inspected. We connect you with installers who treat the gas side and the electrical side as one job.
Learn more →The switch is what separates your house from the utility while the generator runs. Without one, power can travel back down the line toward the crews working on it. This is the part of the job nobody should improvise.
Learn more →A unit that will not start, throws a fault, or runs briefly and quits. Most of what fails traces back to a machine that sat untouched for years. We connect you with people who service other companies' installations.
Learn more →Oil, filters, battery, fuel connections, and a real test under load rather than the self-exercise the unit runs on its own. A generator that is never serviced is a generator that fails on the day you needed it.
Learn more →Before equipment gets chosen, someone should walk the property: where a unit can legally sit, how far that is from the gas supply and the panel, and what you actually need running when the power is out.
Learn more →Get the siting and scope sorted before anyone quotes equipment.
Call 801-823-6018A few details now saves you a sales conversation later.